top of page
NTBGinside.jpg

iNDUSTRIAL & INSTITUTIONAL

PROJECTS

INDUSTRIAL PROJECTS

industrial-kilauea-culvert.jpg

Kilauea Culvert DOT Emergency Repairs

Kauai
Completed: March 2012

New concrete culvert with precast and conventional concrete placement for HDOT. This emergency replacement was done after heavy rains washed out the roadway. Multiple crews worked long hours to allow the road to reopen within weeks.

KDB_0002.jpg

Wailua Cane Haul Bridge

Kauai
Completed: September 2012

Demolition of a single lane plantation bridge with replacement of 510 foot 2-lane Acrow panel prefabricated metal bridge. Also consists of road widening, retaining and barrier walls, relocating utilities, adding bike lanes and improving traffic signals.

Piwai Water Tank.jpg

Piwai Water Tank

Kauai
Completed: January 2012

New construction of 500,000 gallon storage tank and connecting pipeline. Engineered and installed an atmospheric control valve and upgraded SCADA system to allow multiple tanks to function under the same control center.

Omao Water Tank.jpg

Omao Water Tank

Kauai
Completed: December 2006

Demolition of the existing 200,000 gallon water tank and removal of the tank’s asbestos-containing roof panels. New construction of a 500,000 gallon water tank and Control Valve Station.

INSTITUTIONAL PROJECTS

DSC_2763.JPG

Lihue Baseyard Improvements, Department of Water

Kauai
Completed: August 2016

New two-story administration building to replace an aging DOW facility. Project includes a public lobby, offices, and conference rooms and also features a self-sustaining demonstration garden with natural and local sustainable plants. This building to act as a emergency response facility for the island of Kauai.

DSC01695.JPG

Kaikea Fire Station (Kealia)

Kauai
Completed: September 2010

New fire station composed of pre-engineered metal building. Kauai’s first fire station featuring separate men and women areas.

OKJC_0226.jpg

Ronald T. Y. Moon Judiciary

Oahu
Completed: November 2009

New 200,000 sq. ft. pre-cast concrete facility consisting of 3 separate structures. This includes a four-story structures with 13 court rooms, central plant, and juvenile detention facility consisting of an entire food service kitchen, dining and food storage area.

NTBG.JPG

National Tropical Botanical Garden Research Center

Kauai
Completed: February 2008

New 20,000 square feet concrete structure consisting of administrative offices and research and education facilities.

Image Group 101.jpg

Kauai Judiciary Complex

Kauai
Completed: September 2005

New 115,000 square feet concrete courthouse.

bottom of page